We have the know-how you need.

Landry Homes offers a personal approach to home building. In today's fast paced world we believe you should have someone to help achieve your home building goals. We use the newest technology and practices to achieve high quality.  Our strength is helping you understand the whole process and the expectations in meeting builds times 

Scroll Down

COMBINED EXPERIENCE

Construction Reference Guide

​

We are a licensed home builder, back by Progressive Home Warranty.offer excellent warranty service beyond possession.

  • ONE Year insurance coverage on workmanship and materials

  • TWO years on distribution and delivery system

  • FIVE years on the building envelope

  • TEN years on major structural components

​

​

Pre-Construction meeting and planning

​

  • We will sit down and design the homes and blueprints of your choice once the Purchase Agreement and spec's are signed.

  • To make sure the home is designed to suit the building pocket we will consult with our professional team.

  • Once the completed building plans are finished we will meet to review. Now that everything is confirmed with the blueprints we submit them to the municipal building permit office for approval.

  • We may or may not need to have a construction meeting with you before stage 1 begins.

Stage 1 Foundation

​

  • Permits are issued, time to start.

  • Stakes out  of the home foundation.

  • Excavation for the house begins followed by footing preparation.

  • Soil tests are completed to ensure lot conditions meet engineering of the new home. 

  • The foundation walls are prepared with temporary wood forms while concrete is poured inside them.

  • Weeping tile is installed as well as damp-proofing ensuring a waterproof barrier to the outside of your foundation.

  • Utility trench is open for water, gas, electrical,fiber optics 

  • City inspection approval happens, then back-fill.

​

Stage 2 Framing

​

  • The engineered floor begins constuction and completed

  • Exterior walls, Tall wall, interior walls, and second floor are framed and sheeted

  • Roof trusses are manufactured and delivered to site for installation.

  • Dual or Triple pane windows and doors are installed.

  • Fireplaces are installed.

  • Engineered stair system is installed on the interior

  • Electrical and plumbing services are roughed in and inspected.

  • Mechanical's are roughed in for heating/cooling/venting.

  • All code inspections have happened

​

Stage 3 Exteriors & Interiors 

​

  • Exterior walls are insulated as well as vapour barrier is installed on wall and ceiling.

  • City inspection for proper insulation and barrier is done.

  • Drywall begins and is completed in many stages

  • Concrete in the basement and garage is prepared and poured.

  • Heating and cooling systems are installed.

  • All exterior siding on the envelope begins. Vinyl, stucco, hardie board, stone, and the eavestroughing are installed.

  • The garage doors are installed.

  • The interior is primed and ceilings are textured.

  • Interior finishing work including doors, casings, baseboards and shelveings are installed.

  • All cabinetry is installed in your home.

  • Railings are fitted and installed 

  • The interior painting is completed.

  • Floor tiles are installed.

  • The counter tops are installed and backsplash tiling is completed.

  • Hardwood flooring is installed.

  • Carpet is installed.

  • Plumbing fixtures are installed

  • Final heating and cooling components are installed and tested.

  • Driveway and walkways are poured

  • Parging of the exterior of the home.

  • Rough grading of the lot is completed

  • Municipal final  inspections begin and are completed.

​

Walk though 

​

  • Final touches and deficiencies are completed.

  • Your home is cleaned thoroughly.

  • Home walk-though is completed explaining all the features of your home, your package and answering any questions you may have. 

  • Last-minute touch-ups will be completed if noted on walk-through.

  • Possession, once all money has been transferred and the lawyers have given approval, you will be handed your keys